Yandin Wind Farm Sub Station
Earthworks
The site is located within the Iluka mining lease and was being utilised as farmland. Initially the site was covered with thick grazing pasture over a sandy surface, with much of the site inundated following a relatively wet winter. The site sloped gently down in a general westerly direction with a surface level difference of about 2 m across the site. The winter groundwater level was at surface level.
Scope included:
Site clearing
Facilitate the importing of over 70,000m3 of fill
Subgrade preparation of over 36,000m2
Excavate & shape swale drains & batters
Rock pitch batter protection
Install reinforced concrete box culverts
Over 9000m2 of bituminous surfacing
Full road construction
Traffic control associated with works
Project value: $4.5 million
Completion date: November 2019